1700523854961

Rail extension design almost complete

We’re excited to announce the design of the rail extension into our site is almost complete.

Rail transport is an essential part of our project as we will be moving almost 1,000,000 tonnes of material to and from our site.

By using rail rather than road, we will avoid up to 30,000 trucks travelling from Perth, down the highway and through the town of Collie and back each year, saving millions of litres of diesel and making the roads a little safer for us all.

Thank you Graham Oliver and team at Concept Rail Services Pty Ltd for your great work.